Lotus Port Project
The Lotus Port Project was successfully completed in two phases: 2019 and 2020.
Supplied products: SPC900H
Quantity: 30 sets
Inspection standard: PIANC 2002
Inspection and certification unit: Bureau Veritas Vietnam
Project Images:
|